Figure. Original View Boundary consisting of 2 splines and 3 construction
lines.
Figure. Two smart points will be created on the vertical edges (which are
named objects). In the figure below the right and left end point of the
spline have been edited to be associated to the smart points on the vertical
edges. As a result, the upper spline in the view boundary updates whenever
the model is changed.
Figure. Two smart points will be created on the vertical edges (which are
named objects).